Project Description
AIM OF THE PROJECT
Site safety management at design and executive stage (CSE, CSP): extraordinary maintenance for the adjustment of the treatment plant in Milano S. Rocco. Adaptation of secondary sedimentation tanks crane ways through scarification.
Insertion of heating cables to prevent freezing and casting with special mortar
.
SERVICES PROVIDED
Site safety management at design stage (CSP)
Site safety management at execution stage (CSE)
ACTIVITIES
- drafting of site safety plan (PSC)
- verification of companies’ operative safety plans (POS: Piano Operativo di Sicurezza)
- operative management of interested areas during construction
- verification of the application of the provisions specified in the safety plans (PSC and POS)
- presence on the site for at least 15 h/week
- reporting and communication to the customer and the site manager
- drafting of the construction dossier
PROJECT PLUS
- overhead work by mechanical means: development of operative procedures
- coordination of the activity with plant managers to ensure service continuity
- employment of mechanical means on the runways of scraping bridges