Project Description
AIM OF THE PROJECT
Evaluation of the technical suitability of suppliers in accepting specific waste. Evaluation of the compliance with the requirements of ISO 9000/2015 and DL 231/2001 standards.
SERVICES PROVIDED
Verification of the compliance with the requirements of ISO 9000/2015 and DL 231/2001 standards.
ACTIVITIES
- site inspections in 8 plants
- survey report
- mass balance for the evaluation of the treatment capacity
- report to managers and technicians, containing an evaluation of the residual capacity of the systems
PROJECT PLUS
- instruments for the calculation of plant capacity have been directly provided to customer technicians
- objective demonstration of the technical verification of the systems
- concrete application of regulations (DL 231/2001)